May 2020, BUILD Update

June 8, 2020

Hey Church!

May was a big month in moving our building project forward.

We were able to work to stabilize the soil, begin laying concrete block, and seeing the base structures go up.

Thanks so much for your prayers towards the facility and the men and women, who are working on it.

Grace & peace,

Dean

Construction activities on site included:

  • The concrete subcontractor stoning the building pad.
  • The concrete subcontractor installing perimeter foundations and concrete piers.
  • The concrete subcontractor foundation insulation and backfill.
  • The mason installed CMU foundation walls with grouting. 
  • The structural steel subcontractor unloaded about 75% of the structural steel materials.